Centralized Water Purification System
♦ Main Application:
Centralized Water Purification System
The product is used for multi bed hemodialysis and related treatment water in medical institutions. Such as for concentration of power preparation ,hemodialysis ,reusing dialyzers.
Centralized Water Purification System
The product is used for multi bed hemodialysis and related treatment water in medical institutions. Such as for concentration of power preparation ,hemodialysis ,reusing dialyzers.
System Feature:
- 10” Touch Screen ,exactly control
- Adopt imported PLC Logic control
- With automatic protection of low & high pressure
- With automatic switch feature for the first & second stage to ensure usage of emergency situation
- Alarm of exceeding standard for water quality of second stage .
- With manual & automatic can switch when the system is working .
- Automatically flush circulation loop after stopping to prevent growth of bacteria.
- Supply water of Circulation loop with constant voltage
- The RO Part adopt sanitary material UPVC /304
The Parameter:
Type & Spec. | CY-BYXT-II-500/1000/1500/2000/3000/4000L/H | ||||||||
The Raw Water Quality | Tap water ,TDS≤200ppm,Pressure 0.2~0.4Mpa,Water Temperature:5~40℃ | ||||||||
Supply Power | 380VAC,50HZ | Operation Pressure | 0.2-0.6Mpa | ||||||
Water Quality | Meet YY0572-2005,meet USA AAMi/ASAIO Standard of hemodialysis water ,removal rate of bacterial endotoxin ≥99%,No dead cavity. | ||||||||
Production Water Quantity | 500L/H | 1000L/H | 1500L/H | 2000L/H | 3000L/H | 4000L/H | |||
Power | 2500VA | 3500VA | 5000VA | 7000VA | 10000VA | 15000VA | |||
Inlet Diameter | DN 25 | DN 32 | DN 40 | DN 40 | DN 50 | DN 50 | |||
Outlet Diameter | DN 20 | DN 25 | DN 25 | DN 32 | DN 32 | DN 40 | |||
Suitable Beds | 5-10 | 10-20 | 20-30 | 30-40 | 40-60 | 60-80 | |||
Size | 2000×750×1600mm | 2200×750×1600mm | 2500×850×1600mm | 3200×850×1600mm | |||||
Weight | 580kg | 800kg | 980kg | 1100kg | 1500kg | 2000kg | |||
Installation Area | 10㎡ | 15㎡ | 25㎡ | 35㎡ | 40㎡ | 55㎡ |
Note: 1. The temperature requirement of usage &installation is 5-40℃,Humidity ≤80%, There is no direct sunlight in the equipment room , The floor drain is set on the ground and the drainage is sooth.
- The bearing capacity of room should meet installation of requirement .This product should avoid running in environment with strong electromagnetic interference.